Baystar are due to start an open water source heat pump installation at Anglesey Abbey on the behalf of The National Trust. The source of energy for the project will be a river located about 130 meters away from the abbey and the usable heat will be used for a mixture of conservation heating, comfort heating and hot water. The project is due to start at the end of May and will take around 6 weeks to complete, live updates will be uploaded on our twitter account once our engineering team are on site.