Services

Sustainable Energy Solutions
Mechanical & Electrical Engineering

Sector

Large Domestic

Value

c£85,000

Programme

2 months

Client

Private

Location

West Sussex

An idyllic farm estate set in 200 acres of woodland featuring a 6 bedroom farmhouse, separate cottage, office, gym private stables and an outdoor pool.

The requirement was to design and install a biomass boiler and district heating system to heat the main farmhouse, a stable cottage and outdoor pool.

Baystar installed a 80kW biomass boiler alongside a small district heating scheme. Baystar also modified an existing outbuilding to create a plant-room and constructed a custom-built high-specification woodchip store incorporating a chip shifter.

A project of this size will earn c£9,000 per annum in Renewable Heat Incentive payments for 20 years, and the fuel cost saving will be approximately 50%.